AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Does qcast still work8/8/2023 Gasketed Box External Joint Test Installation.Scale Calibration Calculator & Guide for Plants.Scale Calibration Guide for Independent Agencies.Below is a list of all template forms and Videos that are available: New tools have been added to the ACPA members sonly website under Quality/QCast Tools with regards to joint design. Update on “QCast tools” on the ACPA members only website The auditors will check if the tolerances shown on the product design is matching with the measurements taken. Note: Starting this year, ACPA is tightening up the joint audits during the sanitary product audit. When this is the case, records of the cover are required instead of the cage dimensions. Appendix A () – “Box Culvert Reinforcement Inspection - Single Cell.” A note was added with regards to the span and rise cage dimension records for the cases when the cover can be measured to the core.Also, see Item 14 below, same change applies to MH & Precast reinforcement inspection. Appendix A ( & 90) – “Pipe Reinforcing Inspection Worksheet” and “Manhole & Precast Reinforcing Inspection Worksheet” – Editorial change on substituting “Horizontal” with “Circumferential” and “Vertical” with “Longitudinal.” Also, only circumferential area check is shown in the table to mirror item 9 above.When using segmented joint forming equipment, proof of design testing is now done based on size groups instead of each individual size. Product Testing” Clarification language was added for the proof of design testing for gasketed box culverts. Box Culvert and Three-Sided Requirements (-46) – “13.Pipe Requirements () - “13.2.1 Reinforcement Round Pipe Three-Edge-Bearing Tests.” Clarification language was added on “when” the pipes should be tested initially when the size/class is “first run”.Pipe Requirements & Manhole Requirements” ( & 35) – “Dimensional Test Reports on Pipe Barrels.” All information shown on the sample form at the appendix for pipe and manhole dimensional are considered minimum requirements.The respective appendix form is also updated to mirror these changes (Item 13 below). Also added circumferential steel area, longitudinal steel area is not required. Reinforcing” – Added requirement for wire spacing, this applies to both the circumferential and longitudinal wires. Pipe Requirements & Manhole Requirements ( & 34) – “7.The intent of this section is for the products to be marked with the QCast identification such as the QCast emblem, the wording change allows other identification than the QCast Emblem to be used in marking the product such as written “QCast” text. Product Marking” – the word “emblem” was substituted with “identification”. Calibration” Concrete thermometers and Gasket Durometers were added to the list of equipment that require a calibration. Also please note that there are two notes added at the end of the table related to reinforcing. Materials” Frequency of reinforcing mill certifications are required on a monthly basis instead of annually.
0 Comments
Read More
Leave a Reply. |